About Us

Established in 1984, Keda Group has 42 member companies including Keda Group Co., Ltd.

We provide sustainable renewable energy for everyone
Group Industry

Keda Group has set up subordinate organizations in Beijing, Shanghai, Shenzhen, Hangzhou, Yantai, Qingdao, Binzhou, etc. and set up engineering project offices in 12 provinces and cities in China.

We provide sustainable renewable energy for everyone
Corporate Culture

Develop by technology, establish Keda brand, provide quality products and satisfy customers.

We provide sustainable renewable energy for everyone
Contact Us

Advocate the corporate spirit of hardworking, selfless contribution, dedication and patriotism, pursuit of excellence.

We provide sustainable renewable energy for everyone
Base Infrastructure
Home / Group Industry / Base Infrastructure
Boshan-Laiwu Expressway
Built in the hilly areas, Boshan-Laiwu Expressway is 44.086km long, 23m wide (road surface 20.5m wide). It is a fully enclosed overpass, with bidirectional 4-lane and 1.5m wide median barrier. It has three tunnels, 2 grand bridges, 3 big bridges, 2 flyovers, and 1 interchange. The longest tunnel is 814m. The 460m reinforced concrete continuous rigid frame project (located at K9+520) has a span of 75m+135m+135m+75m, which is one of the highest highway bridges in Shandong Province. The project started in October 1996 and was completed and put into use in September 1999.