About Us

Established in 1984, Keda Group has 42 member companies including Keda Group Co., Ltd.

We provide sustainable renewable energy for everyone
Group Industry

Keda Group has set up subordinate organizations in Beijing, Shanghai, Shenzhen, Hangzhou, Yantai, Qingdao, Binzhou, etc. and set up engineering project offices in 12 provinces and cities in China.

We provide sustainable renewable energy for everyone
Corporate Culture

Develop by technology, establish Keda brand, provide quality products and satisfy customers.

We provide sustainable renewable energy for everyone
Contact Us

Advocate the corporate spirit of hardworking, selfless contribution, dedication and patriotism, pursuit of excellence.

We provide sustainable renewable energy for everyone
Base Infrastructure
Home / Group Industry / Base Infrastructure
Dongying Yellow River Highway Bridge

Dongying Yellow River Highway Bridge is connected with the Dongqing section and Qinglin section of Changchun-Shenzhen Expressway, and the Rongcheng-WuhaiExpressway, Dongying-LvliangExpressway, and Dongying Shugang Expressway. It is a key section of China’s “7918”expressway network and also a key component of Shangdong Province’s expressway network. It is an important channel for the connection with the Yellow River Delta Efficient Ecological Economic Zone, Blue Economy Zone of Shandong Peninsula, Circum-Bohai Sea Economic Zone, and the economic areas of Beijing, Tianjin and Tangshan.

Dongying Yellow River Highway Bridge is 2,743.1 meters long, among which the main bridge is 852.8 meters and the approach bridge is 1,890.3 meters. The span of the southern approach bridge uses 2-opening 42m prestressed concrete simply-supported box girder and a 5-opening 42m simply-supported and continuously supported box girder. The span of the main bridge uses one (116+200+220+200+116)m prestressed concrete rigid framework continuous girder. The span of northern approach bridge uses quadruple 5-opening 42m simply-supported and continuously supported box girder, and quadruple 4-opening 42m simply-supported and continuously supported box girder, and 2-opening 42m prestressed concrete simply-supported box girder.

Grade: bidirectional 4-lane expressway, 26m wide (same width for road and bridge)
Designed driving speed: 100km/h.
Designed load grade: automobiles- 20+ ton; trailer- 120 ton
Designed flood standard: 1/300 (Yellow River Bridge); 1/100 (connection)
Seismic basic intensity: VII, fortified according to VIII standards.
Navigation standard: IV grade course, 2 bridge openings, net height 8m, net width 80m.